Pump Rebuilding Essay, Research Paper

Today most of our electric power is produced by Nuclear Power Plants.

Nuclear reactors must be constantly cooled in order to maintain a level of

safety. There are two types of pumps used for cooling the reactor, the

centrifical pump, and the circulating pump. The cooling water pump is a

critical part in a nuclear plant and must be rebuilt continuously to avoid a

reactor melt down. Here are some simple instructions that, if followed,

will make your rebuild job safe, reliable and quick.

First, lock out the electrical breaker that supplies power to the pump.

This will prevent someone from accidentally starting the pump while you

are working on it, thus eliminating a dangerous accident.

Second, close the suction line and the discharge line to the pump, then

open the drain. Opening the drain will relieve any internal pressure in the

pump.

Third, dismantle the pump housing. Most pumps that are built in the

United States have casing?s that are bolted together with 9/16 bolts.

Using a ratchet will save you time.

Fourth, remove the rubber seals from the suction and discharge side of

the pump housing and replace.

Fifth, inspect the bearings for wear or signs of overheating. Over heating

normally causes the bearing to turn bluish in color; if this is observed the

bearing should be replaced.

Sixth, remove the gasket from the pump housing. Since the pumps are

exposed to high heat a scrapper may be needed to remove it completely.

Caution should be used so that the housing is not gouged. Sand the

housing and install new gasket.

Seventh, bolt the housing back together. Since most cooling water pumps

are low pressure, torquing is not required.

Eighth, Open suction and discharge valves. Leave the drain line open until

you see a steady stream of water coming out, then close the drain. This

will keep the seals from burning up do to the pump not being primed.

Ninth, unlock the breaker and test run the pump.Be sure that the suction

and discharge pressures are correct. If the pump develops the right

pressures, it is functioning properly.

Tenth, return the pump to service and secure the next pump to be rebuilt.

If these steps are followed closely, it should allow you to rebuild your

pump quickly, safely, and efficiently, thus lengthening the time between

rebuilds.

Внимание, отключите Adblock

Вы посетили наш сайт со включенным блокировщиком рекламы!
Ссылка для скачивания станет доступной сразу после отключения Adblock!

Скачать
Рефераты по иностранным языкам Pump Rebuilding Essay, Research Paper Today most of our electric power is produced by Nuclear Power Plants. Nuclear reactors must be constantly
Оценок: 1010 (Средняя 5 из 5)

Наверняка у вас есть товары или услуги, продажа которых приносит вам максимальную прибыль. Для быстрого старта в сети вам необходимо создание посадочной страницы (одностраничного сайта), на которой будет размещена информация о маржинальных товарах/услугах интернет магазина. За 8 лет опыта разработки конверсионных страниц мы выработали оптимальную структуру, которая позволит привлекать через landing page больше продаж. На такую структуру «одевается» ваш контент — фирменный стиль, тексты, фотографии, уникальные торговые предложения, после чего страница выходит в свет. Разработка лендинга и запуск в сети — до 7 рабочих дней. Стоит отметить, что в разработку самой посадочной страницы входит и написание копирайтером продающих текстов для вашего бизнеса, чтобы каждый посетитель страницы захотел совершить покупку именно у вас. Результат: качественно разработаная продающая посадочная страница, которая готова приносить вам новых клиентов.

© 2016 - 2022 BigEdu.ru